NO.1 Which of the following is NOT a type of float?
A. Free
B. Negative
C. Total
D. Open end
Answer: D

CCP 真実   

NO.2 A major theme park is expanding the existing facility over a five-year period. The design phase
will be completed one year after the contract is awarded. Major engineering drawings will be
finalized two years after the design contract is awarded and construction will begin three years after
the award of the design contract. New, unique ride technology will be used and an estimate will need
to be developed to identify these costs that have no historical data.
The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from the right side
of your split screen, using the drop down menu, to reference during your response/choice of
responses.
Select the statement that best describes the method to estimate the cost of the new rides:
A. Use historical data from past projects
B. Adjust known data from existing rides
C. Call vendors for quotes
D. Break down the technology into components
Answer: B

CCP 最新   

NO.3 A major theme park is expanding the existing facility over a five-year period. The design phase
will be completed one year after the contract is awarded. Major engineering drawings will be
finalized two years after the design contract is awarded and construction will begin three years after
the award of the design contract. New, unique ride technology will be used and an estimate will need
to be developed to identify these costs that have no historical data.
The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from the right side
of your split screen, using the drop down menu, to reference during your response/choice of
responses.
Why is a +/- notation necessary when developing an estimate?
A. It makes up for the lack of time to develop a real estimate
B. There are unknowns that affect the final cost of a project
C. It is a government requirement
D. Contingency cushion
Answer: B

CCP 認定デベロッパー   

NO.4 A major theme park is expanding the existing facility over a five-year period. The design phase
will be completed one year after the contract is awarded. Major engineering drawings will be
finalized two years after the design contract is awarded and construction will begin three years after
the award of the design contract. New, unique ride technology will be used and an estimate will need
to be developed to identify these costs that have no historical data.
The following is NOT an advantage of the critical path method:
A. The ability to show slippage in the progress of key activities
B. Reveals activities that additional resources need to be dedicated toward
C. The ability to determine cost overruns of critical path activities
D. The ability to identify activities that cannot have their schedules slip if the desired project end date
is to be achieved
Answer: C

CCP テキスト   

JPexamのAACE InternationalのCCP 日本語版問題集試験トレーニング資料を利用すれば、認定試験に合格するのは簡単になります。うちのAACE InternationalのCCP 日本語版問題集試験トレーニング資料は豊富な経験を持っている専門家が長年の研究を通じて開発されたものです。JPexamの学習教材は君の初めての試しでAACE InternationalのCCP 日本語版問題集認定試験に合格するのに助けます。

AACE International CCP 日本語版問題集試験を目前に控えて、不安なのですか。我々社のAACE International CCP 日本語版問題集問題集のソフト版を購買するに値するかまだ疑問がありますか。こうしたら、我々JPexamのCCP 日本語版問題集問題集デーモを無料にダウンロードして行動してみよう。我々提供するCCP 日本語版問題集試験資料はあなたの需要を満足できると知られています。我々にとって、AACE International CCP 日本語版問題集試験に参加する圧力を減らして備考効率を高めるのは大変名誉のことです。

CCP試験番号:CCP問題集
試験科目:Certified Cost Professional (CCP) Exam
最近更新時間:2017-10-10
問題と解答:全115問 CCP 受験料過去問
100%の返金保証。1年間の無料アップデート。

>> CCP 受験料過去問

 

JPexamのサイトでは、あなたがAACE InternationalのCCP 日本語版問題集認定試験を気楽に準備することができますし、普通なミスを避けるのもできます。JPexamのAACE InternationalのCCP 日本語版問題集試験トレーニング資料は高度に認証されたIT領域の専門家の経験と創造を含めているものです。それは正確性が高くて、権威性も高いです。JPexamは君にとって、ベストなチョイスだといっても良いです。

JPexamは最新の1z0-964問題集と高品質のE_HANABW151問題と回答を提供します。JPexamのJN0-333 VCEテストエンジンと70-339試験ガイドはあなたが一回で試験に合格するのを助けることができます。高品質の200-155 PDFトレーニング教材は、あなたがより迅速かつ簡単に試験に合格することを100%保証します。試験に合格して認証資格を取るのはそのような簡単なことです。

記事のリンク:http://www.jpexam.com/CCP_exam.html